In December 2020, an explosion at Wessex Water’s Avonmouth water recycling centre claimed the lives of four workers - Michael James (64), Brian Vickery (63), Raymond White (57), and apprentice Luke Wheaton (16). The blast was caused by a build-up of methane gas in a silo containing biosolids used for fertiliser. Despite the dangerous nature of the process, the explosion exposed shocking gaps in risk assessment, maintenance, and incident prevention practices.


The Health and Safety Executive (HSE) and the Environment Agency launched extensive investigations. It was later revealed, through reports made public in April 2025, that Wessex Water had been warned as early as 2015 that the silos might be holding an explosive mixture. According to BBC coverage, a consultant raised concerns that methane levels could rise during sludge storage and drying, particularly as the plant used anaerobic digestion - a process known to produce combustible gases.


Despite these early warnings, the explosion occurred while workers were performing routine maintenance. Investigators found no effective ventilation system in place to disperse built-up gases, no updated risk assessments addressing explosion risk, and no formal permit-to-work system that would have triggered gas detection procedures. The resulting blast not only caused four deaths but also led to extensive structural damage and psychological trauma among other staff.


What Went Wrong at Avonmouth?

The explosion at Wessex Water’s Avonmouth plant on 3 December 2020 was the result of a complex failure in managing foreseeable risks - not simply a freak accident. Multiple layers of health and safety breakdowns contributed to the tragedy, as later investigations revealed.


Ignored Warnings About Methane Risk

In 2015, an independent consultant raised concerns that methane gas could build up in the biosolids storage silos used at the site. These silos held digested sludge from the company’s anaerobic digestion process - an environment inherently prone to gas generation. However, Wessex Water failed to act on the warning or update their risk assessments to reflect the serious danger posed.


No Gas Monitoring During Maintenance

On the day of the explosion, workers were conducting routine maintenance on one of the biosolids tanks. Critically, there were no gas detection systems being used at the time, and no checks for explosive atmospheres had been carried out prior to entry. The confined space work was conducted without adequate ventilation, allowing a significant methane concentration to build up inside the silo - well within the explosive range.


Lack of Permit-to-Work or Confined Space Procedures

Despite the inherently hazardous nature of the task, no formal permit-to-work process was in place. A permit would have triggered a risk review, atmospheric gas testing, and likely stopped the task from proceeding until safety controls were in place. There was also no defined confined space entry procedure in effect, even though the work clearly met the criteria under health and safety law.


No Learning from Past Events

Further investigation found that previous smaller gas incidents at other UK treatment sites had not been systematically shared or learned from across the business. This lack of cross-site communication and lessons learned is a clear indicator of a siloed safety culture, which ISO 45001 seeks to eliminate through integrated, organisation-wide processes.


Leadership and Oversight Failures

The Health and Safety Executive’s investigation noted a lack of senior leadership accountability. The Board was not made aware of the 2015 risk warnings, nor were they actively reviewing unresolved safety concerns. This absence of top-level engagement meant that systemic failings were not identified or corrected over the five-year period leading up to the disaster.


Outdated or Incomplete Risk Assessments

Risk assessments reviewed during the post-incident investigation were found to be incomplete or outdated, and did not accurately reflect the changing risk profile of the biosolids storage operation. In a high-risk industrial setting, such documentation must be living, regularly reviewed, and matched to real-world operating conditions. That was not the case here.


No Emergency Response Preparedness

There was no specific emergency procedure for the explosion scenario that unfolded. Although staff reacted bravely, the lack of rehearsed emergency plans or explosion response protocols meant that the site could not respond effectively in the critical seconds following the blast.


How ISO 45001:2018 Could Have Helped

ISO 45001 is a global standard for occupational health and safety management systems (OHSMS). It’s built to prevent incidents exactly like this by embedding a proactive, continuous safety culture within an organisation.


Here’s how it could have made a difference at Avonmouth:


1. Proactive Hazard Identification (Clause 6.1.2) ISO 45001 requires the identification of foreseeable hazards and regular reviews. The methane build-up warning in 2015 would have been logged, risk-rated, and followed up with clear controls and timelines.


2. Operational Controls (Clause 8.1) The standard calls for documented controls over high-risk activities. This includes permit-to-work systems, confined space entry protocols, and gas detection procedures. These would likely have prevented workers from entering the silo area without proper atmospheric monitoring.


3. Worker Consultation (Clause 5.4) Involving employees and contractors in safety reviews is central to ISO 45001. Had this been in place, routine maintenance staff could have raised issues about the smell of gas or concerns about safety equipment - possibly before tragedy struck.


4. Emergency Preparedness and Response (Clause 8.2) Well-structured ISO 45001 systems include planning and testing emergency response procedures. Even if gas build-up occurred unexpectedly, this could have led to better containment or evacuation procedures.


5. Leadership and Accountability (Clause 5.1) Most critically, ISO 45001 demands top management’s active involvement and accountability. It’s likely that if Wessex Water had an ISO 45001-certified system, there would have been far greater board-level oversight and tracking of unresolved safety actions.


Lessons for UK Industry

The Avonmouth explosion underscores the vital need for structured health and safety management in all sectors - but especially where biological or chemical processes are used.


If a globally respected utility provider can miss risks that were flagged nearly five years before a fatal explosion, then no organisation can afford to be complacent. ISO 45001 gives businesses the tools, structure, and accountability to ensure safety is not left to chance.


Conclusion

The devastating incident at Avonmouth was a painful reminder of what can happen when risk assessments are not followed through, safety systems are informal, and leadership is not actively engaged in managing health and safety. ISO 45001 is not just about compliance - it’s about prevention, responsibility, and protecting lives.


Let this tragedy lead to change. Don’t wait until something goes wrong.


Learn how AAA Certification Ltd can support you in achieving ISO 45001:2018. Sign up to a Certification Audit with AAA and take the first step towards achieving ISO 45001 certification.

 
 
 